
TxA Maintenance
3.2.2 Tests
The manufacturer performs extensive hardware testing before an operator panel
is approved. Some tests are performed by external testing companies, such as the
Swedish National Testing and Research Institute.
All o perator panels are submitted to testing before leaving the manufacturer.
3.2.3 Replacement
This section contains instructions on how to replace operator panel hardware.
Only components included in the latest bill of material and spare parts list are
allowed.
3.2.4 Cables
Mostoftheoperatorpanelsusethesametypeofflexcableconnectors.
To release the flex cables from the connector, gently push the two flanges on t he
cable connector towards the flex cable, or in some cases, a clip above the complete
connector.
connector flanges
Caution:
Theconnectorsmustbeunlockedonbot
hsidesbeforeremovingthecable ,othe rwise
theflexcablemaybedamaged.
Beijer Electronics, MAEN021
11
Commenti su questo manuale