Beijer-electronics iX Panel T100 EN Manuale Utente Pagina 10

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 46
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 9
Installation
3Installation
3.1 SpaceRequirements
Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
Space requirements when installing the operator panel:
58 mm
228 mm
302 mm
100 mm
(4.0 inch)
100 mm
(4.0 inch)
50 mm
(2.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
(2.28 inch)
(11.89 inch)
(8.98 inch)
Caution:
Theopeningsontheenclosureareforairconvection. Donotcovertheseopenings.
3.2 InstallationProcess
1.
Unpack and check the delivery. If damage is found, notify the supplier.
x 13
Panel cut out 264.5 x 206.0 mm
(10.41 x 8.11 inch)
Note:
Placetheoperatorpanelonastablesurfaceduringinstallation.
Droppingitorlettingitfallmaycausedamage.
BeijerElectronics, MAEN007
10
Vedere la pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 45 46

Commenti su questo manuale

Nessun commento